Customization: | Available |
---|---|
After-sales Service: | 24 Hours |
Warranty: | 3 Years |
Still deciding? Get samples of $ !
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Item | USM-2140 | |
Work Area | 2100*4000*200 mm | |
Transmission |
X, Y | Rack and pinion |
Z | Ball screw | |
Rail Guide | Taiwan HIWIN | |
Motor and driver | Japan Yaskawa servo motor and driver | |
Spindle | 9KW HQD air cooling spindle | |
Spindle speed | 6000~24000 r/min | |
Inverter | Sunfar Inverter | |
Control System | Taiwan Syntec control system | |
Software | ARTCAM, JD painting, Alphacam | |
Tool Changer Type | automatic linear tool changer | |
Maximum Tool Holder Diameter | 12.7 mm | |
Maximum Air Move Speed | 40000 mm/min | |
Effective Machining Speed | 15000 MM/min | |
Machining Precision | ±0.05 mm | |
Table | vacuum table | |
Working Command | G command | |
Working Voltage | 380V/5PH/50Hz | |
Accessory |
vacuum pump | |
dust collector | ||
work-box | ||
Warranty | 3 years |
Q1: How do I install and run the machine?
A1: Our technicians have installed the machine before delivery. For the installation of other configurations, we send detailed training videos and user manuals with the machine.
95% of customers can teach themselves.
Q2: I don't know which kind of CNC milling machine suits me.
A2: Can you tell us what you do? What kind of material you need to cut and the size of the board, then we have a professional sales staff to recommend the most suitable engraving machine for you.
Q3: What should I do if I want to see the condition of the machines in your factory and it is not convenient to go to China?
A3: We support production visualization services. The sales department that responds to your inquiry in the first place will be responsible for your follow-up work. You can contact him/her to go to the factory to check the production progress of the machine, or we can send you the sample pictures and videos you need.
Q4: What should I pay attention to when cutting ?
A4: Before starting the machining process, it is important to verify that the selection procedure is correct, that the process parameters are correctly named, that external auxiliary gases are available, and that the sheet position is accurate.
In order to prevent the deformation of the plate during processing, resulting in collision, the machine should not be disturbed during the working process. When the machine is running, the operator should always pay attention and should not leave the machine to ensure the correct operation of the machine.
Q5: What's your delivery date?
A5: Standard machine about 15 working days; For custom machines, about 20 working days.